MTB Project Logo

Trail runs along a fence line up to the start of the Lower Ridge Line Blue Blazed trail.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.8

Miles

1.3

KM

Singletrack

548' 167 m

High

336' 102 m

Low

212' 65 m

Up

0' 0 m

Down

5%

Avg Grade (3°)

14%

Max Grade (8°)

Dogs Leashed

E-Bikes Unknown

No night rides.

Description

The MDC has cleared a significant number of trees along this trail so it an easier ride than in years past.

It starts off with a fairly rocky climb along a chain link fence. There is one tree obstacle along the way (see photo). A little past the tree the trail will widen and connect up with the power line run. You can stay left on the singletrack but the trail is very muddy in the spring and very overgrown in the summer. At the end of the trail, you'll merge into the fire road.

Contacts

Shared By:

Glenn Duzy

Trail Ratings

  3.5 from 2 votes

#22386

Overall
  3.5 from 2 votes
5 Star
0%
4 Star
50%
3 Star
50%
2 Star
0%
1 Star
0%
Trail Rankings

#160

in Connecticut

#22,386

Overall
1 Views Last Month
205 Since Jul 30, 2015
Intermediate/Difficult Intermediate/Difficult

0%
0%
50%
0%
50%
0%

Photos

Start of the fence line trail. The MDC had been doing a lot of clearing in 2015.
Jul 30, 2015 near Farmington, CT
The one obstacle on the Fence Line Trail.
Jul 30, 2015 near West Ha…, CT

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Jul 15, 2018
John Taylor
9mi — 2h 00m
Welcome

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started