Adventure Projects is hiring a web engineer to join us in Boulder, CO
MTB Project Logo

South Trail

 2.0 (1)

1.8 Miles 2.9 Kilometers


Singletrack

35' 11 m

Ascent

-82' -25 m

Descent

1%

Avg Grade (1°)

6%

Max Grade (3°)

99' 30 m

High

51' 16 m

Low

Shared By Phantom Joker

Conditions


Unknown

Getting forecast...

A moderatly challenging trail with some nice scenery.

Phantom Joker

Dogs Unknown

Features -none-

Description

This track is part of the many paths and trails in the JR Alford Greenway. It runs along the southern boundary of the park, paralleling the CSX RR tracks.

The trail can be accessed from the main parking area at the end of Pedrick Rd. There are few surprises, for the most part, but the track can be rooty in places. Many other paths (some singletrack, others are multi-use) split off from this one so, there are always bailout options if desired.

This trail can be ridden in conjunction with the many miles of multi-use offroad trails in the park, or you can take the bridge over the CSX RR tracks and enjoy more cycling at Lafayette Heritage Trail, East Cadillac Trail, and beyond.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  2.0 from 1 vote

#7

in Tallahassee

#24707

Overall
  2.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
0%
2 Star
100%
1 Star
0%
Rankings

#7

in Tallahassee

#378

in Florida

#24,707

Overall
1 Views Last Month
116 Since Apr 5, 2014
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter