Adventure Projects is hiring an Android engineer to join us in Boulder, CO
MTB Project Logo

Vince's Tire Trail

 3.0 (1)

0.2 Miles 0.3 Kilometers


Singletrack

0' 0 m

Ascent

-111' -34 m

Descent

10%

Avg Grade (6°)

20%

Max Grade (11°)

2,451' 747 m

High

2,340' 713 m

Low

Shared By Eric Ashley

Conditions


Unknown

Getting forecast...

Lively singletrack beneath the power lines.

Eric Ashley

Dogs Unknown

Features -none-

The trails on Beacon Hill and Camp Sekani utilize areas of public and private property. Respect boundaries and stay on the trails so that these locations continue to be a great area to bike in Spokane.

Description

This is a quick and lively jaunt beneath the powerlines. Keep an eye out for a few abandoned tires the trail's namesake.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  3.0 from 1 vote

#18107

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#568

in Washington

#18,107

Overall
1 Views Last Month
77 Since Jan 14, 2014
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter