Adventure Projects is hiring a web engineer to join us in Boulder, CO
MTB Project Logo

Lakeside Trail

 4.2 (5)

4.8 Miles 7.7 Kilometers


Singletrack

227' 69 m

Ascent

-235' -72 m

Descent

2%

Avg Grade (1°)

21%

Max Grade (12°)

1,047' 319 m

High

992' 302 m

Low

Shared By ESG Greene

Conditions


Minor Issues 62 days ago
Dry, Fallen Trees - A couple trees across the trail History

Getting forecast...

Fast bench cut singletrack, purpose made for biking, generally following the edge of the reservoir.

ESG Greene

Dogs Unknown

Features -none-

Closed during hunting season and seasonally in the spring. Please do not ride wet trails.

Description

This is a generally smooth and moderate trail that follows the edge of the West Branch Reservoir.

It begins just to the left off of Cable Line Rd after you follow the doubletrack Parking Lot Connector from the parking area. Follow the trail as it twists and turns along bench cuts next to the reservoir. You'll cross sonwmobile trails, but it is always obvious where the bike trail goes. The trail ends at the other end of Cable Line Rd.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

Nov 10, 2018
David Clingingsmith
Snow and leaf covered. Quite slippery. Ground mostly hard.
Aug 10, 2018
Mike Kizis
Trail in good condition. Skills over obstacles improving. 5.8mi
Nov 7, 2016
Joe Homa
Full tour 11.4mi
Jun 4, 2016
Zeb Misko
Mile 2 has a tree crossing the road 4.8mi
Aug 9, 2015
Kevin Wirth
Oct 12, 2013
David Good

Stewarded By


Trail Ratings

  4.2 from 5 votes

#5860

Overall
  4.2 from 5 votes
5 Star
40%
4 Star
40%
3 Star
20%
2 Star
0%
1 Star
0%
Rankings

#93

in Ohio

#5,860

Overall
7 Views Last Month
1,064 Since Sep 4, 2013
Easy/Intermediate Easy/Intermediate

0%
80%
20%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter