MTB Project Logo

Quarry Trail

 3.5 (2)

2.3 Miles 3.7 Kilometers


Singletrack

108' 33 m

Ascent

-99' -30 m

Descent

2%

Avg Grade (1°)

10%

Max Grade (6°)

1,141' 348 m

High

1,072' 327 m

Low

Shared By ESG Greene

Conditions


Unknown

Getting forecast...

A rocky trail that gives you some challenges.

ESG Greene

Dogs Unknown

Features -none-

Closed during hunting season and seasonally in the spring. Please do not ride wet trails.

Description

This trail is found on the left as you head uphill from the intersection of Cable Line and Porter Roads.

This is a loop that can be ridden in either direction, but is described in the clockwise direction here. At the split stay to the right. Shortly on the right there will be an old quarry. The trail then turns uphill and continues for a while along a ridge. The last mile is frequently very rocky. Exit at the intersection to head back to Porter Rd.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

Jun 1, 2018
Ben Puterbaugh
Pdfd

Stewarded By


Trail Ratings

  3.5 from 2 votes

#13369

Overall
  3.5 from 2 votes
5 Star
0%
4 Star
50%
3 Star
50%
2 Star
0%
1 Star
0%
Rankings

#154

in Ohio

#13,369

Overall
4 Views Last Month
741 Since Sep 4, 2013
Intermediate/Difficult Intermediate/Difficult

0%
0%
0%
67%
33%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter