MTB Project Logo

Quarry Trail

 3.0 (1)
Trail Mapped Wrong?

Length

2.3 Miles 3.7 Kilometers


Singletrack

Elevation

108' 33 m

Ascent

-99' -30 m

Descent

2%

Avg Grade (1°)

10%

Max Grade (6°)

1,141' 348 m

High

1,072' 327 m

Low

Conditions


All Clear 13 days ago
Trail is open, and reports are that its in good condition. History

Getting forecast...

A rocky trail that gives you some challenges.

ESG Greene

Overview

Closed during hunting season and seasonally in the spring. Please do not ride wet trails.
Features: -none- [Add/Remove]

Description [Suggest Changes]

This trail is found on the left as you head uphill from the intersection of Cable Line and Porter Roads.

This is a loop that can be ridden in either direction, but is described in the clockwise direction here. At the split stay to the right. Shortly on the right there will be an old quarry. The trail then turns uphill and continues for a while along a ridge. The last mile is frequently very rocky. Exit at the intersection to head back to Porter Rd.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

Jun 1, 2018
Ben Puterbaugh
Pdfd

Stewarded By


Trail Ratings

  3.0 from 1 vote

#15031

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#169

in Ohio

#15,031

Overall
17 Views Last Month
664 Since Sep 4, 2013
Intermediate/Difficult Intermediate/Difficult

0%
0%
0%
100%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter