MTB Project Logo

Maintenance Trail

 1 vote

Length

1.5 Miles 2.4 Kilometers


Doubletrack

Elevation

132' 40 m

Ascent

-109' -33 m

Descent

3%

Avg Grade (2°)

14%

Max Grade (8°)

809' 247 m

High

693' 211 m

Low

Conditions


Unknown

Getting forecast...

The original park road which makes a good connector between trails.

Brian Vize

Overview

Description

This is the remains of the original FDR Park road. The southern loop is nearly singletrack and greenery filled in along the edges leaving a path through. The northern loop and the road leaving the parking area is gravel. This is still used by the city for access, but very rarely used.

Many trails are headed off of the road at one point or another. This trail will get you to nearly all trails and also makes a good way to find your way back to the parking area.

Contacts

You & this Trail


Rate Quality


   Clear Rating

Rate Difficulty

Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Trail Ratings

  1.0 from 1 vote

#9

in FDR Park

#22495

Overall
  1.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
100%
Rankings

#9

in FDR Park

#155

in Iowa

#22,495

Overall
4 Views Last Month
148 Since Aug 14, 2013
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter