MTB Project Logo

green Western Greenway (Mill St to Metropolitan Pkwy)

Trail

1.2 mile 2.0 kilometer point to point
Doubletrack
Easy

Elevation

Ascent: 44' 13 m
Descent: -31' -10 m
High: 205' 63 m
Low: 168' 51 m

Grade

Avg Grade: 1% (1°)
Max Grade: 5% (3°)

Dogs

Unknown
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Kai Troester

Weather

Getting forecast...

Current trail conditions

Minor Issues 35 days ago See History

Popular rides nearby

Navigate on-trail with our free app

iOS App Store Android App Store

Biked this trail?

Add details to help others plan their adventure.

A packed gravel trail that allows access to the more challenging trails.

Kai Troester

E-Bikes Unknown

Features -none-

Description

This is a section of the Western Greenway which runs through the towns of Belmont, Lexington and Waltham. It's a very easy and mostly level trail that is your connection to the more challenging trails in the area.

After leaving the Lone Tree Hill area at Mill St this trail runs through the meadows of the the Rock Meadow conservation area. It then crosses a bridge into woods of the the Beaver Brook conservation area where it is a well packed gravel road.

Contacts

Local Club: GB NEMBA

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

Feb 17, 2019
Eddie T
Feb 28, 2018
Colin Giblin
Oct 30, 2016
Andy Quindeau
Smooth, beautiful ride!

Trail Ratings

  3.3 from 4 votes

#15451

Overall
  3.3 from 4 votes
5 Star
0%
4 Star
25%
3 Star
75%
2 Star
0%
1 Star
0%
Rankings

#257

in Massachusetts

#15,451

Overall
37 Views Last Month
2,025 Since Aug 9, 2013
Easy Easy

75%
25%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter