MTB Project Logo

Johnny Behind the Rocks Trails - Johnny Draw to Red Ridge

 4.5 (21)

4.3 Miles 7.0 Kilometers


95%

Singletrack

660' 201 m

Ascent

-661' -201 m

Descent

6%

Avg Grade (3°)

18%

Max Grade (10°)

6,024' 1,836 m

High

5,669' 1,728 m

Low

Shared By Darran Wells

Conditions


Unknown

Getting forecast...

A beautiful, short, hilly 3-season loop through sagebrush, sandstone, and junipers.

Darran Wells

Bureau of Land Management Treasures

One of the Bureau of Land Management's "Backyard to Backcountry" treasures, this trail was developed between the Lander Cycling Club and the Lander, WY BLM office to provide world-class riding experiences.

Check out the top 20 BLM Backyard to Backcountry rides!


Dogs Unknown

Features -none-

Overview

Johnny Behind the Rocks (JBR) is the best 3-season cross country MTB trail system near Lander, WY. Home to the annual August MTB race, The Jurassic Classic, the JBR trails wind through pinion pines and junipers along draws and ridges with stunning views of the Wyoming Rockies. Great early and late season riding when the mountains are still too muddy.

Need to Know

Watch out for horses on the trail when you see trailers in the parking lot. Keep gate closed. For a longer ride, include the 1 mile out and back Johnny Falls Trail or the Johnny on Top ridge trail.

Description

This short loop heads up Johnny Draw, climbing good singletrack for a mile to a big open saddle, then winding down and up through sandstone and junipers for another mile to the intersection of 3 trails and a doubletrack.

Turn left at the intersection and descend a fast but occasionally sandy .5 mile section to another intersection.

Turn left again, ascending a short sandy singletrack gut buster for 250 yards to another doubletrack intersection. Turn right and continue climbing for 250 yards to gain the Red Ridge. Wind through Junipers for 1/2 mile to the gentle ridge summit. From here the fun is non-stop as you descend a narrow ridgeline for 1.5 miles with beautiful 360 views all the way back to the parking lot.

History & Background

Johnny Draw is the original trail at JBR. All other trail segments were built since 2000 by mountain bikers for mountain bikers.

Contacts

Local Club: Lander Cycling Club

Feb 10, 2015: Meeting Tonight 2-10-15

Jan 13, 2015: Meeting tonight! 1-13-15

Aug 12, 2014: Trail Work August 13th

Land Manager: BLM Wyoming - Lander

You & This Featured Ride


Rate Quality


   Clear Rating

Rate Difficulty

Share This Ride

Your Check-Ins

Check-Ins

Sep 7, 2018
Andrew Ruesch
Aug 26, 2018
Karim Bekka
Aug 21, 2018
Jamie Goldstein
Jul 24, 2018
Sarah Marie
Aug 20, 2017
Ally Tarbous
7.5mi
Jul 4, 2017
The Tarnelope
Easy up on johnny draw, real fun down on red ridge. Happy 4th!
Oct 23, 2016
mike gibson
Jul 23, 2016
Paul F Rose
Ridge section is a classic beauty

Trail Ratings

  4.5 from 21 votes

#417

Overall
  4.5 from 21 votes
5 Star
62%
4 Star
33%
3 Star
0%
2 Star
5%
1 Star
0%
Rankings

#3

in Wyoming

#417

Overall
34 Views Last Month
10,436 Since Apr 6, 2013
Intermediate Intermediate

0%
11%
89%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter