MTB Project Logo

blue Lakeside Trail

Trail

1.9 mile 3.1 kilometer point to point
Singletrack
Intermediate

Elevation

Ascent: 92' 28 m
Descent: -100' -31 m
High: 308' 94 m
Low: 227' 69 m

Grade

Avg Grade: 2% (1°)
Max Grade: 8% (5°)

Dogs

Unknown
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Richard Russell

Weather

Getting forecast...

Current trail conditions

Unknown See History

Popular rides nearby

Navigate on-trail with our free app

iOS App Store Android App Store

An old reclaimed trail from the South trailhead to the dam spillway.

Richard Russell

E-Bikes Unknown

Features -none-

Description

This 2-mile trail (one-way) begins at the South Trailhead and ends at Lake Lurleen Dam. There, it connects to the much longer Tashka Trail. Lakeside Trail is an excellent option for short hikes and as an introductory ride for novice mountain bikers. It is more difficult than the Ridge Trail. There are longer, steeper climbs and some large roots. It is about half singletrack/ half machine benched. It follows the lake shoreline, providing continuous, beautiful scenery. Use caution. The trail is shared by hikers, bikers and bank fishermen.

Biked this trail?

We need help with the following missing trail information:

Need to Know, Dogs Allowed, Features, E-Bikes Allowed

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

none

Stewarded By


Trail Ratings

  5.0 from 1 vote

#2848

Overall
  5.0 from 1 vote
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#41

in Alabama

#2,848

Overall
1 Views Last Month
140 Since Feb 20, 2013
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter