MTB Project Logo

Lakeside Trail

 1 vote

1.9 Miles 3.1 Kilometers


Singletrack

92' 28 m

Ascent

-100' -31 m

Descent

308' 94 m

High

227' 69 m

Low

2%

Avg Grade (1°)

8%

Max Grade (5°)

Unknown

Update

An old reclaimed trail from the South trailhead to the dam spillway.

Richard Russell

Overview

Description

This 2-mile trail (one-way) begins at the South Trailhead and ends at Lake Lurleen Dam. There, it connects to the much longer Tashka Trail. Lakeside Trail is an excellent option for short hikes and as an introductory ride for novice mountain bikers. It is more difficult than the Ridge Trail. There are longer, steeper climbs and some large roots. It is about half singletrack/ half machine benched. It follows the lake shoreline, providing continuous, beautiful scenery. Use caution. The trail is shared by hikers, bikers and bank fishermen.

Contacts

Rate Trail


   Clear Rating

5.0 from 1 vote


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  5.0 from 1 vote

#2291

Overall
  5.0 from 1 vote
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#46

in Alabama

#2,291

Overall
1 Views Last Month
105 Since Feb 20, 2013
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

Conditions



Getting forecast...

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter