MTB Project Logo

121st Avenue

Easy/Intermediate

Trail

1.4 mile 2.3 kilometer point to point
Doubletrack
Easy/Intermediate

Elevation

Ascent: 55' 17 m
Descent: -145' -44 m
High: 719' 219 m
Low: 615' 187 m

Grade

Avg Grade: 3% (2°)
Max Grade: 7% (4°)

Dogs

No Dogs
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Lucy Murphy

Weather

Current trail conditions

Update Conditions
Unknown See History

Navigate on-trail with our free app

iOS App Store Android App Store

This access road is a dirt/gravel road, mainly for biking, 2.2 kilometers or 1.36 miles long.

Lucy Murphy

Electric Mountain Bikes Unknown

Features -none-

This access road/trail is not plowed in the winter.

Description

Both directions can be ridden on this access road/trail, but for a better explanation, trail heads eastward starting at 46th Street. The trail starts off at an elevation of 213 meters, slightly winds with little elevation gain or loss. This dirt/gravel road is not maintained, so there may be large potholes filled with water after a rain. The trail ends in a large parking lot with easy access to North Swan Creek.

Biked this trail?

We need help with the following missing trail information:

Family Friendly, ADA Accessible, Need to Know, Features, Electic Mountain Bikes Allowed

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

none

Trail Ratings

  5.0 from 1 vote

#2023

Overall
  5.0 from 1 vote
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#60

in Michigan

#2,023

Overall
7 Views Last Month
121 Since Nov 7, 2018
Easy/Intermediate

0%
100%
0%
0%
0%
0%

Photos

Parking area at east side of 121st Avenue accessed from 46th Street.
Nov 7, 2018 near Fennville, MI

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter