Adventure Projects is hiring a web engineer to join us in Boulder, CO
MTB Project Logo

Johnson Draft Trail #491

 3.0 (2)

2.2 Miles 3.6 Kilometers


Doubletrack

182' 56 m

Ascent

-97' -29 m

Descent

2%

Avg Grade (1°)

6%

Max Grade (3°)

2,216' 675 m

High

2,043' 623 m

Low

Shared By Kyle Lawrence

Conditions


Unknown

Getting forecast...

Mostly doubletrack trail with a small section of singletrack. Often shared by equestrians.

Kyle Lawrence

Dogs Off-leash

Features -none-

Description

This trail starts at the parking area for Barley Pond Recreation Area. From the parking lot, the trail heads north through the forest, avoiding the busier trail around Braley Pond. This trail is open to foot traffic and biking, and is frequently used by equestrians as well. The path mostly consists of old roads to about 1.4 miles in; here it switches to singletrack for the rest of the way to the junction with Bald Ridge Trail (496).

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

Aug 19, 2018
John Grubb
13mi

Stewarded By


Trail Ratings

  3.0 from 2 votes

#15500

Overall
  3.0 from 2 votes
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#478

in Virginia

#15,500

Overall
1 Views Last Month
45 Since Jan 18, 2018
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter