MTB Project Logo

Red Trail 6 (310C)

 1 vote

Length

2.6 Miles 4.2 Kilometers


Singletrack

Elevation

169' 51 m

Ascent

-103' -31 m

Descent

2%

Avg Grade (1°)

7%

Max Grade (4°)

513' 156 m

High

410' 125 m

Low

Conditions


Unknown

Getting forecast...

A connector trail.

Christopher Rorden

Overview

Currently closed due to a bridge out on the west side.

Description

This is a connector trail between Blue Trail 1 (310A) and Purple Trail 2 (310B) in the west and Green Trail 4 (310E) and Gray Trail 5 (310D) to the east. This trail starts in a large meadow, but then enters a heavily wooded area with at least one bridge crossing.

Contacts

You & this Trail


Rate Quality


   Clear Rating

Rate Difficulty

Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Trail Ratings

  1.0 from 1 vote

#22463

Overall
  1.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
100%
Rankings

#159

in South Carolina

#22,463

Overall
1 Views Last Month
38 Since Jan 4, 2018
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter