MTB Project Logo

Hill Top

Intermediate
 5.0 (1)

A machine-built, fast and flowing singletrack descent with plenty of rollers to get airborne.


Your Rating:      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.2

Miles

0.3

KM

Singletrack

930' 283 m

High

903' 275 m

Low

0' 0 m

Up

27' 8 m

Down

3%

Avg Grade (1°)

7%

Max Grade (4°)

Dogs No Dogs

E-Bikes Allowed

Description

This trail was originally constructed to connect the singletracks in Shunah Mines to the doubletracks in Centennial Park. In 2016, the connector was improved to be the first machine-built, downhill-specific trail in the park. Expect a fast and flowing singletrack descent with numerous rollers to pump over or to launch from.

The trail ends further down on the Adventure Trail where riders can either head back up to the right into Shuniah Mines or cross over into Centennial Park using a small connector trail to the left.

Contacts

Shared By:

Michael McKenzie

Trail Ratings

  5.0 from 1 vote

#5097

Overall
  5.0 from 1 vote
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#27

in Ontario

#5,097

Overall
1 Views Last Month
43 Since Dec 17, 2017
Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none

Stewarded By