MTB Project Logo

A paved trail through a scenic drainage.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

2.3

Miles

3.7

KM

Doubletrack

740' 225 m

High

478' 146 m

Low

0' 0 m

Up

262' 80 m

Down

2%

Avg Grade (1°)

4%

Max Grade (2°)

Dogs Unknown

E-Bikes Allowed

Description

This is a wide multi-use trail that travels gradually through a drainage. Riders will encounter a number of wooden bridges and a scenic setting along this paved trail. The top of the trail connects to Ridge Road at the perimeter of Ridge Meadows Elementary School, and the bottom of the trail intersects the Al Foster Trail.

Contacts

Shared By:

Eric Ashley with improvements by Kurt Sontheimer

Trail Ratings

  3.0 from 4 votes

#24210

Overall
  3.0 from 4 votes
5 Star
0%
4 Star
25%
3 Star
50%
2 Star
25%
1 Star
0%
Trail Rankings

#444

in Missouri

#24,210

Overall
1 Views Last Month
555 Since Dec 5, 2017
Easy/Intermediate Easy/Intermediate

75%
0%
25%
0%
0%
0%

Photos

Riding the Al Foster
Aug 5, 2013 near Eureka, MO

0 Comments

Weather


Current Trail Conditions

All Clear 34 days ago
Add Your Check-In

Check-Ins

Sep 25, 2021
Allen Tes
Jun 6, 2021
Bob Eulberg
Jun 14, 2020
Ben Hobson
Welcome

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started