MTB Project Logo

Riverwalk Trail

 1 vote

Length

0.6 Miles 0.9 Kilometers


Singletrack

Elevation

56' 17 m

Ascent

-20' -6 m

Descent

2%

Avg Grade (1°)

8%

Max Grade (5°)

157' 48 m

High

110' 34 m

Low

Conditions


Unknown

Getting forecast...

A very rocky roll along the river.

Cheryl Ladota

Overview

Open sunrise to sunset. Stay off the trails for 24 hours after a heavy rain.
Dogs: Leashed

Description

To reach this trail, use the lot on the Stamford side of the park. Follow a short ride on Merriebrook Lane across the bridge, the yellow trailhead will be on your left for the start of the Riverwalk Trail.

There are some very challenging rock steps to climb and descend at the start. After that, you're challenged by boulders, rocks, roots and technical climbs and descents.

Contacts

You & this Trail


Rate Quality


   Clear Rating

Rate Difficulty

Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#16033

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#118

in Connecticut

#16,033

Overall
3 Views Last Month
11 Since Nov 29, 2017
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter