MTB Project Logo

Oak Trail

 1 vote

0.5 Miles 0.8 Kilometers


Singletrack

80' 24 m

Ascent

-27' -8 m

Descent

220' 67 m

High

139' 42 m

Low

4%

Avg Grade (2°)

9%

Max Grade (5°)

Unknown

Update

A steady climb with some technical sections that can be tricky.

Cheryl Ladota

Overview

Open sunrise to sunset. Stay off the trails after a heavy rain and keep the singletrack single.
Dogs: Leashed

Description

The oak trail is a fun and technical steady climb through a forested section of the park between Main Road and Pine Hill Road. This twisty singletrack is full of boulders, rocks, and roots, often in quick succession. At times, climbing the obstacles can be challenging but makes it extra fun if you are riding the hill back down.

Contacts

Rate Trail


   Clear Rating

4.0 from 1 vote


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

Nov 24, 2017
Cheryl Ladota

Trail Ratings

  4.0 from 1 vote

#10134

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#79

in Connecticut

#10,134

Overall
1 Views Last Month
10 Since Nov 29, 2017
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

Conditions



Getting forecast...

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter