MTB Project Logo

Fernmoss Trail

 3.0 (1)

1.3 Miles 2.1 Kilometers


Singletrack

150' 46 m

Ascent

-176' -54 m

Descent

5%

Avg Grade (3°)

13%

Max Grade (7°)

2,830' 862 m

High

2,692' 821 m

Low

Shared By Adam Linstedt

Conditions


Unknown

Getting forecast...

Part of a small trail network around Lake Chestnut, connects to Boulder Line.

Adam Linstedt

Dogs Unknown

Features -none-

Description

One of two trails that head to Lake Chestnut and connect to Boulder Line trail. It rides well in either direction. The section out to the lake is smooth and wide. As wraps around the lake, sometimes joining Boulder Line Trail for a short stretch, it has some rocks and roots and a little climbing. The trail configuration is a "lollipop" loop or you can exit on Lake Chestnut trail, which will also bring you back to the road where you started.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#16830

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#687

in Pennsylvania

#16,830

Overall
2 Views Last Month
66 Since Sep 16, 2017
Intermediate/Difficult Intermediate/Difficult

0%
0%
0%
100%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter