Adventure Projects is hiring an Android engineer to join us in Boulder, CO
MTB Project Logo

Split Rock Trail

 3.0 (1)

1.6 Miles 2.6 Kilometers


Singletrack

86' 26 m

Ascent

-85' -26 m

Descent

2%

Avg Grade (1°)

7%

Max Grade (4°)

1,483' 452 m

High

1,450' 442 m

Low

Shared By Josh Smaage

Conditions


Unknown

Getting forecast...

A short singletrack trail that features decent flow and a few tight turns to keep things entertaining.

Josh Smaage

Dogs Leashed

Features -none-

Description

This is a great trail for beginners to learn the basics, or for riders to drop the hammer and see just how fast they can complete a lap!

You'll get scenic views of Jamestown Reservoir the entire length, and it is a great precursor for the Overlook Trail - just 0.6 miles north near Lakeside Marina and "The Beach." The loop is fairly flat and tame, with just a few short climbs.

Hikers are common on this trail, so be prepared to yield.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

Oct 16, 2017
Jason A
1.6mi

Trail Ratings

  3.0 from 1 vote

#1

in Jamestown

#16711

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#1

in Jamestown

#20

in North Dakota

#16,711

Overall
1 Views Last Month
36 Since Aug 3, 2017
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter