MTB Project Logo

Mackenzie River Trail

 3.0 (1)

0.2 Miles 0.3 Kilometers


Singletrack

0' 0 m

Ascent

-154' -47 m

Descent

15%

Avg Grade (8°)

36%

Max Grade (20°)

3,627' 1,105 m

High

3,472' 1,058 m

Low

Shared By Eric Ashley

Conditions


Unknown

Getting forecast...

A somewhat milder tech trail with several off-camber slabs.

Eric Ashley

Dogs No Dogs

Features -none-

Open during summer park hours. One Way Only: This is designated as a directional trail.

Description

The Mackenzie River Trail splits to the left off of No Duff to take riders on a dirt, root, bridge, and slab playground. The narrow singletrack winds through the trees with some tight corners sections of rougher tech and several off-camber slabs that aren't too taxing compared to adjacent trails. The trail ends on Sidetracks just above Renegade.

Contacts

Local Club: WORCA

Land Manager: Whistler Blackcomb

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#21119

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#21,119

Overall
11 Views Last Month
54 Since Jul 30, 2018
Difficult Difficult

0%
0%
0%
0%
100%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter