MTB Project Logo

Upper Freight Train

 4.0 (1)

0.6 Miles 1.0 Kilometers


Singletrack

0' 0 m

Ascent

-326' -99 m

Descent

10%

Avg Grade (6°)

22%

Max Grade (12°)

5,485' 1,672 m

High

5,159' 1,572 m

Low

Shared By Eric Ashley

Conditions


Unknown

Getting forecast...

An advanced jump trail with lots of tabletops and a bridge jump.

Eric Ashley

Dogs No Dogs

Features -none-

Open during summer park hours.

Description

Upper Freight Train begins where riders roll off the Garbanzo Express Lift. A few rocky berms and smaller tabletop jumps get things started before the doubletrack crosses the road. The left side features a small drop, while the right side is a banked turn. From there, the trail speeds along heading under Blue Velvet and then over Una Moss on a large bridge that makes an impressive tabletop jump if you have the speed!

Next, it's through a clearing and across another road for more jumps and to pass the start of Upper No Joke. A large step-up/step-down mound carries riders to the last few tabletops before the trail ends by merging into Una Moss.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  4.0 from 1 vote

#9552

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#9,552

Overall
1 Views Last Month
50 Since Jul 4, 2017
Difficult Difficult

0%
0%
0%
0%
100%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter