MTB Project Logo

White Tail Trail

 4.0 (1)

0.9 Miles 1.5 Kilometers


Singletrack

11' 3 m

Ascent

-293' -89 m

Descent

6%

Avg Grade (4°)

16%

Max Grade (9°)

2,092' 638 m

High

1,810' 552 m

Low

Shared By Chuck Sokol

Conditions


Unknown

Getting forecast...

Ridge line trail connecting Old Kings Highway to Adams Mountain Trail at the top of Adams Mountain.

Chuck Sokol

Dogs Off-leash

Features -none-

Description

This trail closely follows the ridge line, and is bikeable either up or down Adams Mountain. The lower half of the trail is mostly large gravel/small rocks, whereas the upper half is mostly standard forest ground cover.

Contacts

Land Manager: Town of Rowe, MA

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  4.0 from 1 vote

#10337

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#188

in Massachusetts

#10,337

Overall
3 Views Last Month
18 Since Jun 13, 2017
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter