MTB Project Logo

Trail #4A

 4.0 (1)

0.6 Miles 1.0 Kilometers


Singletrack

67' 20 m

Ascent

-10' -3 m

Descent

2%

Avg Grade (1°)

6%

Max Grade (4°)

1,547' 471 m

High

1,480' 451 m

Low

Shared By Adedayo Ademowore

Conditions


Unknown

Getting forecast...

The best way to the beginning of Trail #4 and to the big pond.

Adedayo Ademowore

This has been hidden from our maps to prevent overlap with existing trails, or because our research has found there is no legal access.

Dogs Unknown

Features -none-

Description

This trail starts at the intersection of Trail #5A and Moose Rd. You'll enter at the gate from Moose Rd onto a farmtruck trail, and head toward a pond. Skip the first trail on the left of the pond, and continue around 25-30 more feet on the truck trail to the second left, cutting into the woods on the singletrack.

Keeping the pond on your left, the trail will pop out of the woods again, and then follow the edge of another field. At the corner of the field, there's a trail entrance sign where you'll enter the woods and begin a gentle climb to merge with Trail #4, where you can continue uphill to the large pond and have a picnic or catch a fish.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  4.0 from 1 vote

#11583

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#305

in New York

#11,583

Overall
2 Views Last Month
12 Since Mar 2, 2017
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter