Give to your favorite local project in IMBA’s Dig In campaign and REI will match all donations up to $25,000!
MTB Project Logo

Orange Blaze Trail

 2 votes

0.6 Miles 0.9 Kilometers


Singletrack

30' 9 m

Ascent

-26' -8 m

Descent

474' 144 m

High

452' 138 m

Low

2%

Avg Grade (1°)

5%

Max Grade (3°)

All Clear

48 days agoUpdate

This trail starts at the west end of Lakeside Drive and follows the shore of Red Cedar Lake to an existing doubletrack.

Neil Angotta

Overview

Hiking and biking only.
Dogs: Off-leash

Description

Once the trail starts off of Lakeside Drive after 500 feet, there is a wet and sometimes muddy section. When wet, the water can be up to 12" deep and the rocks are slippery, so watch your step.

The trail zigzags through dense mountain laurel and climbs for a brief time away from the lake. The trail descends again and follows near the shoreline of Red Cedar Lake. There is a short root section that can be difficult when wet. The trail has been widened over the years by ATV use.

Contacts

Rate Trail


   Clear Rating

1.5 from 2 votes


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Trail Ratings

  1.5 from 2 votes

#20829

Overall
  1.5 from 2 votes
5 Star
0%
4 Star
0%
3 Star
0%
2 Star
50%
1 Star
50%
Rankings

#168

in Connecticut

#20,829

Overall
1 Views Last Month
15 Since Feb 3, 2017
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

Conditions


All Clear 48 days ago

Getting forecast...

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter