Adventure Projects is hiring a web engineer to join us in Boulder, CO
MTB Project Logo

MWRA: Wachusett Aqueduct Trail

 3.0 (1)

6.9 Miles 11.2 Kilometers


Doubletrack

87' 26 m

Ascent

-51' -16 m

Descent

0%

Avg Grade (0°)

3%

Max Grade (2°)

318' 97 m

High

270' 82 m

Low

Shared By Abram Dancy

Conditions


Unknown

Getting forecast...

A mostly-smooth, grassy, flat trail; limited singletrack in northernmost section.

Abram Dancy

Dogs Unknown

Features -none-

Description

A smooth, off-road trail, that is mostly doubletrack. There are a few short sections on pavement to connect together the trail pieces. The northernmost section marked under power lines is more challenging.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#1

in Northborough

#15829

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#1

in Northborough

#261

in Massachusetts

#15,829

Overall
39 Views Last Month
396 Since Jan 31, 2017
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter