Adventure Projects is hiring an Android engineer to join us in Boulder, CO
MTB Project Logo

Red Trail

 3.3 (9)

1.9 Miles 3.1 Kilometers


Singletrack

67' 20 m

Ascent

-71' -22 m

Descent

1%

Avg Grade (1°)

6%

Max Grade (3°)

785' 239 m

High

750' 229 m

Low

Shared By Leonard Box

Conditions


Unknown

Getting forecast...

A fast, flowy trail that runs about 2 miles through the interior of McAllister Park.

Leonard Box

Dogs Leashed

Features -none-

Family Friendly Smooth trails.

The Red Trail is a bi-directional, multi-user natural surface trail. McAllister Park is open daily from 5:00am-11:00pm.

Description

The Red Trail runs through the interior of McAllister park and connects to the Blue Loop near Jones-Maltsberger Rd. and the open sports fields. Red Trail is a trail that cuts east or west through the Blue Loop. This trail is very worn and poses no technical challenges, it is now only for speed.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

Sep 23, 2017
Tracy Quickel
May 13, 2017
TJ .
awesome ride for all MTB riders. lots of Rocky points and a few drops. overall good times
Nov 27, 2008
Lost Justpastnowhere

Stewarded By


Trail Ratings

  3.3 from 9 votes

#12022

Overall
  3.3 from 9 votes
5 Star
22%
4 Star
22%
3 Star
22%
2 Star
33%
1 Star
0%
Rankings

#335

in Texas

#12,022

Overall
10 Views Last Month
305 Since Jan 10, 2017
Easy/Intermediate Easy/Intermediate

33%
67%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter