MTB Project Logo

A mix of old and new trail.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

7.0

Miles

11.2

KM

Singletrack

516' 157 m

High

421' 128 m

Low

577' 176 m

Up

593' 181 m

Down

3%

Avg Grade (2°)

21%

Max Grade (12°)

Dogs Unknown

E-Bikes Unknown

Description

Starting off Railbed, this loop combines a nice mix of tight and twisting, technical sections and fast and flowing sections. This trail will take you by the old barn near Hwy 6 and through the old junk yard section. It is usually ridden as part of the Northside Loop ride. Access to Great Republican can be found on the west side as well as to the Fireroad.

Contacts

Shared By:

Stephen Bond

Trail Ratings

  3.4 from 5 votes

#21618

Overall
  3.4 from 5 votes
5 Star
20%
4 Star
0%
3 Star
80%
2 Star
0%
1 Star
0%
Trail Rankings

#71

in Mississippi

#21,618

Overall
1 Views Last Month
126 Since Dec 5, 2016
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

Photos

Leaf covered switchbacks on the North Loop.
Jan 17, 2017 near University, MS

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Nov 20, 2019
Ryan Sigsbey
Welcome

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started