Adventure Projects is hiring an Android engineer to join us in Boulder, CO
MTB Project Logo

Cyclone Connector

 4.0 (1)

0.6 Miles 0.9 Kilometers


Singletrack

0' 0 m

Ascent

-109' -33 m

Descent

4%

Avg Grade (2°)

9%

Max Grade (5°)

1,648' 502 m

High

1,539' 469 m

Low

Shared By Cape Cod NEMBA

Conditions


All Clear 8 days ago
Dry - Great conditions History

Getting forecast...

A connecting trail from Enchanted Forest to Cyclone.

Cape Cod NEMBA

Dogs Unknown

Features -none-

Description

Cyclone Connector starts at a big intersection just below the top of the Enchanted Forest. Watch the two stream crossings. The Cyclone Trailhead is located just past the first trees of the woods from the Dana Hill Rd intersection.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  4.0 from 1 vote

#1

in Eurich Pond

#10178

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#1

in Eurich Pond

#149

in Vermont

#10,178

Overall
2 Views Last Month
25 Since Oct 24, 2016
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter