MTB Project Logo

Gate and Switch

 2.3 (3)

0.5 Miles 0.8 Kilometers


Doubletrack

17' 5 m

Ascent

-38' -12 m

Descent

2%

Avg Grade (1°)

4%

Max Grade (2°)

840' 256 m

High

802' 244 m

Low

Shared By Eric Ashley

Conditions


Unknown

Getting forecast...

A primary access trail to reach the Tower Road.

Eric Ashley

Dogs Unknown

Features -none-

Description

Built in response to a gate closure that altered the traditional access to the south side of Galbraith, Gate and Switch was opened in mid-2016 to connect riders from the Pipeline Road to the Tower Road.

From the start, the trail makes a number of intersections with Last Call, simply follow the wider trail at each of these intersections until you come to a large wooden bridge. On the other side, the trail winds through a clear cut to eventually end near the kiosk at Checkpoint Alpha.

In the clear cut, keep right at the first intersection and left at the second. These two connector trails feed traffic back onto Gate and Switch for the return.

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  2.3 from 3 votes

#23057

Overall
  2.3 from 3 votes
5 Star
0%
4 Star
0%
3 Star
33%
2 Star
67%
1 Star
0%
Rankings

#768

in Washington

#23,057

Overall
1 Views Last Month
51 Since Oct 15, 2016
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter