Give to your favorite local project in IMBA’s Dig In campaign and REI will match all donations up to $25,000!
MTB Project Logo

Gate and Switch

 2 votes

0.5 Miles 0.8 Kilometers


Doubletrack

17' 5 m

Ascent

-38' -12 m

Descent

840' 256 m

High

802' 244 m

Low

2%

Avg Grade (1°)

4%

Max Grade (2°)

Unknown

Update

A primary access trail to reach the Tower Road.

Eric Ashley

Overview

Description

Built in response to a gate closure that altered the traditional access to the south side of Galbraith, Gate and Switch was opened in mid-2016 to connect riders from the Pipeline Road to the Tower Road.

From the start, the trail makes a number of intersections with Last Call, simply follow the wider trail at each of these intersections until you come to a large wooden bridge. On the other side, the trail winds through a clear cut to eventually end near the kiosk at Checkpoint Alpha.

In the clear cut, keep right at the first intersection and left at the second. These two connector trails feed traffic back onto Gate and Switch for the return.

Rate Trail


   Clear Rating

2.5 from 2 votes


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Trail Ratings

  2.5 from 2 votes

#18458

Overall
  2.5 from 2 votes
5 Star
0%
4 Star
0%
3 Star
50%
2 Star
50%
1 Star
0%
Rankings

#596

in Washington

#18,458

Overall
2 Views Last Month
38 Since Oct 15, 2016
Easy Easy

100%
0%
0%
0%
0%
0%

Conditions



Getting forecast...

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter