MTB Project Logo

A connector from the Main Junction to phase two of the Forever Wild Trail System.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.6

Miles

0.9

KM

Singletrack

298' 91 m

High

274' 84 m

Low

41' 13 m

Up

32' 10 m

Down

2%

Avg Grade (1°)

4%

Max Grade (2°)

Dogs Leashed

E-Bikes Unknown

Description

This connector has a long boardwalk from Connector A and then drops off onto an intermediate trail that connects to Zion Cemetery Ridge Trail.

Contacts

Shared By:

Jesse Hess

Trail Ratings

  3.0 from 3 votes

#24651

Overall
  3.0 from 3 votes
5 Star
33%
4 Star
0%
3 Star
0%
2 Star
67%
1 Star
0%
Trail Rankings

#275

in Alabama

#24,651

Overall
1 Views Last Month
68 Since Sep 12, 2016
Easy/Intermediate Easy/Intermediate

67%
0%
33%
0%
0%
0%

Photos

Looking east toward phase two.
Sep 12, 2016 near Taylor, AL

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started.