MTB Project Logo

Gateway Trail

Easy/Intermediate

Trail

1.3 mile 2.1 kilometer point to point
Doubletrack
Easy/Intermediate

Elevation

Ascent: 98' 30 m
Descent: -78' -24 m
High: 333' 101 m
Low: 258' 79 m

Grade

Avg Grade: 3% (1°)
Max Grade: 7% (4°)

Dogs

Unknown
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Zachary Wagner

A mellow doubletrack that connects up to some of the singletrack trails in the area.

Zachary Wagner

E-Bikes Unknown

Features -none-

Description

Part of the Grater Woods system of trails, the Gateway Trail is a mellow doubletrack trail that connects up to some of the more interesting singletrack trails in the area. It starts either at Beebe Lane, or at the other end from the edge of the baseball/soccer field by Merrimack Middle School.

The trail itself is clear and mostly easy, though coming from the field you are treated to a nice, short little uphill grind.

Biked this trail?

We need help with the following missing trail information:

Photos, Need to Know, Dogs Allowed, Features, E-Bikes Allowed

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#5

in Grater Woods

#19476

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#5

in Grater Woods

#216

in New Hampshire

#19,476

Overall
5 Views Last Month
96 Since Sep 8, 2016
Easy/Intermediate

0%
100%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter