MTB Project Logo

Shumway

Intermediate/Difficult
 4.3 (7)

Signature flow trail in the new Marshall Conservation land.


Your Rating:      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

1.1

Miles

1.8

KM

Singletrack

761' 232 m

High

554' 169 m

Low

0' 0 m

Up

207' 63 m

Down

4%

Avg Grade (2°)

10%

Max Grade (6°)

Dogs Unknown

E-Bikes Unknown

Description

This is the first trail built in the new Marshall Conservation Area. This trail starts on the left hand side of the gated entrance, switch backs up then across the gravel road where it turns into a super fun flow trail with lots of technical turns and rock elements to either hit or take the easy go-round.

Contacts

Shared By:

Lloyd Blizzard

Trail Ratings

  4.3 from 7 votes

#7951

Overall
  4.3 from 7 votes
5 Star
71%
4 Star
14%
3 Star
0%
2 Star
0%
1 Star
14%
Trail Rankings

#49

in New Hampshire

#7,951

Overall
1 Views Last Month
2,545 Since Aug 2, 2016
Intermediate/Difficult

0%
0%
33%
0%
67%
0%

Photos

Rock kickers and bank turns.
Aug 2, 2016 near Conway, NH
One of many banked turns.
Aug 2, 2016 near Conway, NH
Marshall Conservation Parking.
Aug 2, 2016 near Conway, NH

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Jun 2, 2019
Mike Nims
Sep 14, 2017
Rob H
Wonderful find! Good climbing, with fun and flows downhill. 10mi
Jul 17, 2017
Luis Fernandez
Jul 14, 2017
Louie Mansfield
Nov 13, 2016
Ben McCoy
FUN