MTB Project Logo

Top Down

 2 votes

Length

0.7 Miles 1.1 Kilometers


Singletrack

Elevation

63' 19 m

Ascent

-52' -16 m

Descent

3%

Avg Grade (2°)

6%

Max Grade (4°)

383' 117 m

High

327' 100 m

Low

Conditions


Unknown

Getting forecast...

A relatively flat section of the trail going towards the bike trail parking lot.

Jamie Bechta

Overview

Description

This trail begins at a forked intersection with Farm Way and heads down towards Holliston Highway and the bike parking lot. This trail takes you south towards the NEMBA owned area of land. It has some man-made features mixed in but is mostly singletrack cross-country trail. Beware of small rock drops or "jumps" into tight corners if you choose to ride over such features.

Contacts

You & this Trail


Rate Quality


   Clear Rating

Rate Difficulty

Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  2.5 from 2 votes

#19869

Overall
  2.5 from 2 votes
5 Star
0%
4 Star
0%
3 Star
50%
2 Star
50%
1 Star
0%
Rankings

#407

in Massachusetts

#19,869

Overall
4 Views Last Month
18 Since May 23, 2016
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter