Adventure Projects is hiring a web engineer to join us in Boulder, CO
MTB Project Logo

Back 40

 3.0 (1)

0.6 Miles 1.0 Kilometers


Singletrack

12' 4 m

Ascent

-55' -17 m

Descent

2%

Avg Grade (1°)

5%

Max Grade (3°)

1,264' 385 m

High

1,209' 369 m

Low

Shared By Trevor Miller

Conditions


Unknown

Getting forecast...

This trail connects The Pines to The Landfill under the hydro lines.

Trevor Miller

Dogs Unknown

Features -none-

Description

The Back 40 runs under the hydro lines, taking you from The Pines section of trails towards The Landfill. Overall, a fast trail that dips down and across a couple bridges before exiting the hydro cut and re-entering the pine cover.

Contacts

Local Club: Waterloo Cycling Club

Land Manager: Region of Waterloo

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#20131

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#238

in Ontario

#20,131

Overall
2 Views Last Month
29 Since May 9, 2016
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter