Adventure Projects is hiring a web engineer to join us in Boulder, CO
MTB Project Logo

Abercrombie Encore

 3.0 (1)

0.5 Miles 0.8 Kilometers


Singletrack

7' 2 m

Ascent

-71' -22 m

Descent

3%

Avg Grade (2°)

6%

Max Grade (4°)

1,286' 392 m

High

1,223' 373 m

Low

Conditions


Unknown

Getting forecast...

A series of sharp turns heading down the valley. Un enchainement de virage.

Plein-Air Ste-Adele

Dogs Leashed

Features -none-

Description

This singletrack can be accessed from either side, at the bottom of Encore et Encore or from Abercrombie. The moderately hilly section has many turns and switchbacks that head southeast across the valley.

Contacts

Local Club: Plein-Air-Ste-Adèle

Jun 2, 2016: Inauguration 40/80

Jan 16, 2014: Photos – Paysages

Jan 21, 2012: Le ski de fond est parfait.

Land Manager: Hôtel Le Chantecler

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  3.0 from 1 vote

#20545

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#247

in Quebec

#20,545

Overall
1 Views Last Month
16 Since Apr 28, 2016
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter