MTB Project Logo

Parkway Loop

 2 votes

Length

3.0 Miles 4.8 Kilometers


Doubletrack

Elevation

194' 59 m

Ascent

-222' -68 m

Descent

3%

Avg Grade (2°)

7%

Max Grade (4°)

660' 201 m

High

597' 182 m

Low

Conditions


Unknown

Getting forecast...

A loose gravel doubletrack path that runs parallel to the Whitewater Center Parkway.

Vinnie Connors

Overview

Trails stay closed after rain much longer here than other trails in the area. For trail status check: usnwc.org
Dogs: Leashed

Description

This trail connects the WWC parking lot to the entrance at Belmeade Dr. and allows access to both WWC East and Academy trails. It is a loose gravel doubletrack that weaves through the trees on both sides of the entrance road to the Whitewater Center. This trail is good for adding more mileage to your ride or as a warm-up/cool-down.

Contacts

You & this Trail


Rate Quality


   Clear Rating

Rate Difficulty

Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

Apr 6, 2018
Blair Howard
2nd trail of the day
Mar 30, 2017
Nathalie Lavigne
Aug 26, 2016
Adrian Parker
Warmup on new Habit — 0h 16m

Stewarded By


Trail Ratings

  3.0 from 2 votes

#13365

Overall
  3.0 from 2 votes
5 Star
0%
4 Star
50%
3 Star
0%
2 Star
50%
1 Star
0%
Rankings

#359

in North Carolina

#13,365

Overall
17 Views Last Month
230 Since Apr 10, 2016
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter