Adventure Projects is hiring a web engineer to join us in Boulder, CO
MTB Project Logo

Bike Trail #5 - Klingle Road Bridge South

 3.0 (1)

1.8 Miles 3.0 Kilometers


Paved Path

39' 12 m

Ascent

-32' -10 m

Descent

1%

Avg Grade (0°)

8%

Max Grade (4°)

62' 19 m

High

36' 11 m

Low

Shared By Kristen Arendt

Conditions


Unknown

Getting forecast...

A multi-use path leading out of the southern end of the park.

Kristen Arendt

Dogs Unknown

Features -none-

Description

Unlike many of the other multi-use paths featured at Rock Creek Park, Bike Trail #5 is rolling for the duration of the trail. The trail begins within the park borders, and continues past the southern boundary. Though the portions within the park are heavily shaded, the portions that follow neighborhood roads are a bit more exposed. This route connects many nearby neighborhoods with the park, and thus this is a popular location for all kinds of activities. Keep an eye out, and be courteous to other visitors.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#16205

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#16,205

Overall
17 Views Last Month
579 Since Mar 21, 2016
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter