MTB Project Logo

Multi-use trail that is perfect for kids and provides connections to local trail heads and parks.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

6.0

Miles

9.7

KM

Doubletrack

5,397' 1,645 m

High

5,226' 1,593 m

Low

43' 13 m

Up

209' 64 m

Down

1%

Avg Grade (0°)

6%

Max Grade (4°)

Dogs Leashed

E-Bikes Allowed

Family Friendly Perfect for kids. Look for short single track options that parallel the main trail.

The 9th Street, Black Bridge, and Railroad underpasses may be flooded during high water (mid-late June).

Description

This multi-use path is paved with crushed gravel, which makes it fairly easy to navigate, even for little ones. The path is wide (about 10') so there is plenty of space for cyclists and the other trail users that you'll most likely meet along the way.

This trail is best used to connect the various trailheads in town. On the way, you'll pass the pump track, make your way past the river, and through downtown Caon City (if you take 3rd street). This is a great path for beginners to get comfortable on a bike!

Contacts

Shared By:

Lower Ark MBA with improvements by Mike Engelkes

Trail Ratings

  3.0 from 4 votes

#24113

Overall
  3.0 from 4 votes
5 Star
25%
4 Star
0%
3 Star
25%
2 Star
50%
1 Star
0%
Trail Rankings

#2,348

in Colorado

#24,113

Overall
4 Views Last Month
615 Since Jan 9, 2016
Easy/Intermediate Easy/Intermediate

60%
20%
20%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started.