MTB Project Logo

Whistle Stop to ITS 89

 3.0 (1)

2.8 Miles 4.5 Kilometers


Doubletrack

187' 57 m

Ascent

-81' -25 m

Descent

2%

Avg Grade (1°)

5%

Max Grade (3°)

415' 126 m

High

292' 89 m

Low

Shared By Andrew Magoun

Conditions


Unknown

Getting forecast...

ATV trail to get to ITS 89. A fat bike is needed in multiple spots.

Andrew Magoun

Dogs Unknown

Features -none-

Description

This trail is a wide ATV trail, with little elevation change. There are many sections where the trail is loose dirt/sand mixed with packed dirt and roots.

The recommended route is to start at the Whistle Stop General Store and ride along the railroad tracks for a little bit. Then cross over Route 113 and enjoy the trail.

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#17925

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#103

in Maine

#17,925

Overall
1 Views Last Month
106 Since Nov 25, 2015
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter