MTB Project Logo

Raspberry

 2.0 (2)

0.6 Miles 1.0 Kilometers


Singletrack

66' 20 m

Ascent

-104' -32 m

Descent

5%

Avg Grade (3°)

10%

Max Grade (6°)

1,253' 382 m

High

1,173' 358 m

Low

Shared By Matt Block

Conditions


Bad / Closed 33 days ago
Fallen Trees - These trails need serious maintenance. On two occasions I lost the trail completely History

Getting forecast...

A quick jaunt with an option to hit the shore.

Matt Block

Dogs Off-leash

Features -none-

This trail is generally closed during the Spring thaw. It's generally open mid-March through mid-April.

Description

The trail starts at a multi-intersection with Hanna's Run and doubletrack trails. Raspberry drops down and climbs a hillside before entering an open grassy space created from a past tornado that wiped out the hardwoods. You'll encounter a few rocks and roots along the way. About halfway through the trail, you'll see the option to take the Raspberry - Shore Access trail for an additional out-and-back option. The trail ends at an intersection with a doubletrack trail where you can continue on to Dust Bowl.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  2.0 from 2 votes

#22641

Overall
  2.0 from 2 votes
5 Star
0%
4 Star
0%
3 Star
50%
2 Star
0%
1 Star
50%
Rankings

#334

in Wisconsin

#22,641

Overall
1 Views Last Month
36 Since Nov 14, 2015
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter