MTB Project Logo

Rush Pond Way Trail

 2 votes

Length

2.5 Miles 4.1 Kilometers


Doubletrack

Elevation

167' 51 m

Ascent

-126' -38 m

Descent

2%

Avg Grade (1°)

9%

Max Grade (5°)

515' 157 m

High

415' 126 m

Low

Conditions


Unknown

Getting forecast...

Check out the hand-constructed bridges along with views of the wetlands.

Jerry Hicks

Overview

Features: -none-
Family Friendly: A wide-open gravel doubletrack suitable for all ages.
Dogs: Leashed

Description

The Rush Pond Way Trail is approximately 2 miles long and connects the Gurney Lane Recreation Area with the trails at the Queensbury School campus and Farr Lane. The main trail is gravel doubletrack with some short, but quite steep climbs that can be a challenge for beginners.

Contacts

You & this Trail


Rate Quality


   Clear Rating

Rate Difficulty

Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

Oct 22, 2015
s linke

Trail Ratings

  2.5 from 2 votes

#1

in Queensbury

#20028

Overall
  2.5 from 2 votes
5 Star
0%
4 Star
0%
3 Star
50%
2 Star
50%
1 Star
0%
Rankings

#1

in Queensbury

#565

in New York

#20,028

Overall
4 Views Last Month
153 Since Oct 22, 2015
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter