MTB Project Logo

blueBlack Green Trail

Navigate on-trail with our free app

iOS App Store Android App Store

Trail

0.6 mile 0.9 kilometer point to point
Singletrack
Intermediate/Difficult

Elevation

Ascent: 53' 16 m
Descent: -89' -27 m
High: 318' 97 m
Low: 255' 78 m

Grade

Avg Grade: 5% (3°)
Max Grade: 14% (8°)

Dogs

Leashed
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Aaron Caveglia

Navigate on-trail with our free app

iOS App Store Android App Store

Weather

Getting forecast...

Current trail conditions

Unknown See History

Popular rides nearby

Biked this trail?

Add details to help others plan their adventure.

One of the more technical parts of Bay West.

Aaron Caveglia

E-Bikes Unknown

Features -none-

Park hours 7 AM to 11 PM. Do not ride when wet.

Description

The Green Trail connects the Blue Trail at the old trolley bed in the west end of the park with Bay Front Road in the northeast, near the Fish and Game Club parking lot.

This is the most technical trail in Bay Park West, featuring rocks, roots, and wooden bridges. A common route is to take Green trail east to west, back into the park after descending Blue Trail to Fish and Game, but the trail rides well in both directions.

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

none

Stewarded By


Trail Ratings

  3.7 from 3 votes

#13147

Overall
  3.7 from 3 votes
5 Star
0%
4 Star
67%
3 Star
33%
2 Star
0%
1 Star
0%
Rankings

#357

in New York

#13,147

Overall
5 Views Last Month
154 Since Jul 24, 2015
Intermediate/Difficult Intermediate/Difficult

0%
0%
50%
50%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter