MTB Project Logo

Green Trail

 3.5 (2)

0.6 Miles 0.9 Kilometers


Singletrack

53' 16 m

Ascent

-89' -27 m

Descent

5%

Avg Grade (3°)

14%

Max Grade (8°)

318' 97 m

High

255' 78 m

Low

Shared By Aaron Caveglia

Conditions


Unknown

Getting forecast...

One of the more technical parts of Bay West.

Aaron Caveglia

Dogs Leashed

Features -none-

Park hours 7 AM to 11 PM. Do not ride when wet.

Description

The Green Trail connects the Blue Trail at the old trolley bed in the west end of the park with Bay Front Road in the northeast, near the Fish and Game Club parking lot.

This is the most technical trail in Bay Park West, featuring rocks, roots, and wooden bridges. A common route is to take Green trail east to west, back into the park after descending Blue Trail to Fish and Game, but the trail rides well in both directions.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  3.5 from 2 votes

#12870

Overall
  3.5 from 2 votes
5 Star
0%
4 Star
50%
3 Star
50%
2 Star
0%
1 Star
0%
Rankings

#350

in New York

#12,870

Overall
2 Views Last Month
118 Since Jul 24, 2015
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter