MTB Project Logo

Bier Bridge Trail

Intermediate
 4.0 (1)

A great beginner/intermediate singletrack.


Your Rating:      Clear Rating
Your Difficulty:
Your Favorites: Add to Favorites · Your List
Zoom in to see details
Map Key

1.0

Miles

1.6

KM

Singletrack

2,524' 769 m

High

2,240' 683 m

Low

12' 4 m

Up

296' 90 m

Down

6%

Avg Grade (3°)

18%

Max Grade (10°)

Dogs Off-leash

E-Bikes Unknown

Features -none-

Please use restraint during spring breakup. These trails are maintained by volunteers.

Description

After riding Greta's Segway, take a left at the Y. This is a nice flowy, mostly downhill with a nice wide split cedar bridge built by Chris Bier. There is also a nice log pile to ride over or bypass. The trail ends at the bottom of the pipeline. This is a popular trail for hikers, runners and bikers, so be courteous and follow proper trail etiquette.

Contacts

Shared By:

Jim Mellen

Trail Ratings

  4.0 from 1 vote

#11010

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#450

in Idaho

#11,010

Overall
6 Views Last Month
582 Since Jun 18, 2015
Intermediate

0%
0%
100%
0%
0%
0%

Photos

The landowner is a sculptor who loves to place his art along the trail.
Jun 18, 2015 near Sandpoint, ID

0 Comments

Weather


Current Trail Conditions

Update Conditions
All Clear 90 days ago See History
Add Your Check-In

Check-Ins

Jun 14, 2020
Justin Blincoe
Sep 14, 2017
Andrew Pfalzer