MTB Project Logo

McIndoe Farm Parcel 5 Connector

 4.0 (1)

0.8 Miles 1.4 Kilometers


Singletrack

160' 49 m

Ascent

-7' -2 m

Descent

4%

Avg Grade (2°)

13%

Max Grade (7°)

996' 304 m

High

843' 257 m

Low

Shared By Robert Allaway

Conditions


Unknown

Getting forecast...

A back door to Parcel 5 with gracious trail access from McIndoe Farm LLC.

Robert Allaway

Dogs Unknown

Features -none-

Description

This is the best way to get to Parcel 5 from downtown Norwich, avoiding a long road climb up Beaver Meadow Rd. Ride up Brigham Hill Road until you hit a gate - ride around this gate, up the gravel road until you see a bridge. Cross the bridge and follow the yellow and green ribbons all the way up to Parcel 5.

This access trail can have some muddy sections after rain, however, it is generally a loamy, fun trail. Returning to Brigham Hill Road has a steep, fun, buffed out, downhill section that is painful on the way up but very fun on the way down.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  4.0 from 1 vote

#2

in Norwich

#9805

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#2

in Norwich

#139

in Vermont

#9,805

Overall
1 Views Last Month
128 Since May 26, 2015
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter