Ridge Trail

 1 vote
Building Map
Loading Map Data
Map Settings
Featured Ride
Trail

0.3 Miles 0.5 Kilometers


Singletrack

42' 13 m

Ascent

-12' -4 m

Descent

600' 183 m

High

568' 173 m

Low

4%

Avg Grade (2°)

8%

Max Grade (4°)

Unknown

Update

A short connector that starts easy, but ends with a very steep climb to join the Powerline Trail.

Chris McDaniel

Description

This trail connects with Powerline Trail and Main Trail. They are very technical with lots of roots. There are many bursts of short, steep uphill sections with few chances for rest. There are some tight turns and a few dangerous drops, so be careful. The land is owned by the city of Florence, so treat it nicely.

Contacts

Rate Trail


   Clear

3.0 from 1 vote


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

Nov 17, 2015
Chris Reynolds

Trail Ratings

  3.0 from 1 vote

#12276

Overall
  3.0 from 1 vote
1 Star
0%
2 Star
0%
3 Star
100%
4 Star
0%
5 Star
0%
Rankings

#175

in Alabama

#12,276

Overall
1 Views Last Month
11 Since Mar 28, 2015
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

Conditions



Forecasting the weather...

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter