Adventure Projects is hiring an Android engineer to join us in Boulder, CO
MTB Project Logo

El Pollo Elastico

 3.7 (3)

0.5 Miles 0.8 Kilometers


Singletrack

5' 2 m

Ascent

-240' -73 m

Descent

9%

Avg Grade (5°)

17%

Max Grade (10°)

1,237' 377 m

High

1,002' 306 m

Low

Shared By Eric Ashley

Conditions


Unknown

Getting forecast...

Complete trail riding experience in a small package.

Eric Ashley

Dogs Unknown

Features -none-

Galbraith Mountain is privately owned but trails are created and maintained by WMBC. Galbraith is open to non-motorized users except for hunting and fishing. The area is an ongoing site for logging operations so visitors should be on the lookout for temporary trail closures. Trails are multi-use; expect traffic in both directions and yield to hikers and equestrian users.

Description

El Pollo Elastico offers the whole trail riding package in surprisingly little mileage. This Rubber Chicken is a one-way trail dishing up narrow berms, a little climbing, roots and rocks, two rock-slab-rolls, and a couple of kickers.

Generally longer segments of descents are followed by a short climb before repeating. If the trail splits, the right side provides the easier option.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  3.7 from 3 votes

#11850

Overall
  3.7 from 3 votes
5 Star
33%
4 Star
33%
3 Star
0%
2 Star
33%
1 Star
0%
Rankings

#310

in Washington

#11,850

Overall
3 Views Last Month
178 Since Dec 30, 2014
Intermediate Intermediate

0%
0%
67%
33%
0%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter