MTB Project Logo

Atomic Dog

 4 votes

Length

0.8 Miles 1.2 Kilometers


Singletrack

Elevation

0' 0 m

Ascent

-361' -110 m

Descent

9%

Avg Grade (5°)

18%

Max Grade (10°)

1,130' 344 m

High

769' 234 m

Low

Conditions


All Clear 5 days ago
Mostly Dry, Some Mud: Evolution and U-line were in near perfect condition. Atomic Dog was mostly dry with a few patches of mud towards the bottom. History

Getting forecast...

Playful scramble at the base of Galbraith with optional extras.

Eric Ashley

Overview

Galbraith Mountain is privately owned but trails are created and maintained by WMBC. Galbraith is open to non-motorized users except for hunting and fishing. The area is an ongoing site for logging operations so visitors should be on the lookout for temporary trail closures. Trails are multi-use; expect traffic in both directions and yield to hikers and equestrian users.

Description

The traditional follow up to Unemployment Line, Atomic Dog is an intermediate singletrack with more technical parts (roots, rocks, and tighter turns) mixed in with the smoother sections.

Notable highlights of Atomic Dog include two gully step-downs and a wall-ride along a rock boulder all of which have ride around options.

Contacts

You & this Trail


Rate Quality


   Clear Rating

Rate Difficulty

Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

Mar 19, 2016
tharlow harlow
3h 00m
Apr 12, 2015
Bob Merrill

Stewarded By


Trail Ratings

  4.0 from 4 votes

#5447

Overall
  4.0 from 4 votes
5 Star
25%
4 Star
50%
3 Star
25%
2 Star
0%
1 Star
0%
Rankings

#119

in Washington

#5,447

Overall
4 Views Last Month
273 Since Dec 27, 2014
Intermediate/Difficult Intermediate/Difficult

0%
0%
0%
67%
33%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter