MTB Project Logo

blueBlack Atomic Dog

Navigate on-trail with our free app

iOS App Store Android App Store

Trail

0.8 mile 1.2 kilometer point to point
Singletrack
Intermediate/Difficult

Elevation

Ascent: 0' 0 m
Descent: -361' -110 m
High: 1,130' 344 m
Low: 769' 234 m

Grade

Avg Grade: 9% (5°)
Max Grade: 18% (10°)

Dogs

Unknown
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Eric Ashley

Playful scramble at the base of Galbraith with optional extras.

Eric Ashley

E-Bikes Unknown

Features -none-

Galbraith Mountain is privately owned but trails are created and maintained by WMBC. Galbraith is open to non-motorized users except for hunting and fishing. The area is an ongoing site for logging operations so visitors should be on the lookout for temporary trail closures. Trails are multi-use; expect traffic in both directions and yield to hikers and equestrian users.

Description

The traditional follow up to Unemployment Line, Atomic Dog is an intermediate singletrack with more technical parts (roots, rocks, and tighter turns) mixed in with the smoother sections.

Notable highlights of Atomic Dog include two gully step-downs and a wall-ride along a rock boulder all of which have ride around options.

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

Mar 19, 2016
tharlow harlow
3h 00m
Apr 12, 2015
Bob Merrill

Stewarded By


Trail Ratings

  4.2 from 5 votes

#6376

Overall
  4.2 from 5 votes
5 Star
40%
4 Star
40%
3 Star
20%
2 Star
0%
1 Star
0%
Rankings

#158

in Washington

#6,376

Overall
8 Views Last Month
422 Since Dec 27, 2014
Intermediate/Difficult Intermediate/Difficult

0%
0%
20%
60%
20%
0%

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter