MTB Project Logo

Brand-new, serpentine trail cut through hardwood timber.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

2.8

Miles

4.6

KM

Singletrack

144' 44 m

High

132' 40 m

Low

46' 14 m

Up

47' 14 m

Down

1%

Avg Grade (0°)

3%

Max Grade (2°)

Dogs Unknown

E-Bikes Unknown

Trails are still under construction but open to be ridden.

Description

This is a new 80 acre park being built in the City of Petal, MS along the Leaf River. The trail winds through a gum lagoon and around three ponds through some fun, but technical rollers. There are many technical wooden features in the works, so get ready!

Future plans include: an advanced skills area, pump track, and an additional 15 miles of trail on an adjacent 80 acres.

Contacts

Shared By:

Robert Burgess

Trail Ratings

  4.3 from 9 votes

#7553

Overall
  4.3 from 9 votes
5 Star
56%
4 Star
22%
3 Star
22%
2 Star
0%
1 Star
0%
Trail Rankings

#26

in Mississippi

#7,553

Overall
30 Views Last Month
5,475 Since Dec 26, 2014
Intermediate Intermediate

0%
0%
89%
11%
0%
0%

Photos

Bridge through gum lagoon right after a sweet drop!
Jan 9, 2015 near Petal, MS
Bridge over creek bed
Jan 9, 2015 near Petal, MS
Bridge through gum lagoon
Jan 9, 2015 near Petal, MS
150 year old swamp oak along the trail
Jan 8, 2015 near Petal, MS
Skinny bridge following technical section.  Petal River Park Trails
Jan 9, 2015 near Petal, MS
Fallen log along the trail.  Cool feature.
Jan 8, 2015 near Petal, MS
loading

Weather


Current Trail Conditions

Minor Issues 13 days ago
Add Your Check-In

Check-Ins

May 6, 2020
Eric Bean
First ride on a trail other than a National Forest or logging road. It was a blast and I learned a lot. 4.3mi — 6h 40m
Mar 17, 2019
Mario Herrera
Dec 4, 2017
Leonard Fuller
Trail is now 8 miles! Well maintained by Hub ! 8mi
Apr 8, 2017
Travis Faith
3mi
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.