Adventure Projects is hiring an Android engineer to join us in Boulder, CO
MTB Project Logo

Alum Rock Park, Sierra Vista

 3.6 (12)

10.5 Miles 16.9 Kilometers


80%

Singletrack

1,965' 599 m

Ascent

-1,965' -599 m

Descent

7%

Avg Grade (4°)

19%

Max Grade (11°)

2,056' 627 m

High

271' 83 m

Low

Shared By MTB Project Staff

Conditions


All Clear 72 days ago
Dry History

Getting forecast...

Mostly grasslands with cows grazing and great sunset views over valley.

MTB Project Staff

Dogs No Dogs

Features -none-

Overview

Awesome views of the Silicon Valley, San Jose, and SF Bay. On a clear day you can spot San Francisco. Cows grazing won't hurt you. Beautiful sunsets during evening rides.

Can be hot during summer days as there is little shade. Some fairly short steep sections will test you.
Closed Mondays. Closed half hour after sunset.

Description

Start on Penitencia Creek Trail. Winds along in the trees along the creek. Cross bridge over creek, then cross Penitenci Creek Rd. to Creek Trail, Eagle Rock Trail, and N. Rim Trail. Optional go left on Eagle Rock Trail to lookout with about 200 feet of climbing or stay right on N. Rim Trail.

Left on Todd Quick Trail which is singletrack with 6 switchbacks. This trail ends at a picnic table shaded by tall Eucalyptus trees.

Go through the gate to Baccardo Loop Trail. Steep challenge for about 100 yards. Stay right at intersection. (Talking loop trail to the left is VERY steep.) There will be a short very steep section followed by a level section for a 1/4 mile. Then singletrack with some switchbacks up the grassy hill with cows grazing.

Near top go right on Sierra Vista Trail, next left on Kestra Trail. .25 miles to a parking lot near top of mountain.

Cross Sierra Road for 1.2 mile Aquila Loop Trail. Recommend clockwise direction.

History & Background

Kestral and Aquila Loop Trail along with parking near top of mountain on Sierra Road just opened in August of 2014.

Contacts

Land Manager: Santa Clara County Parks

You & This Featured Ride


Rate Quality


   Clear Rating

Rate Difficulty

Share This Ride

Your Check-Ins

Check-Ins

May 30, 2018
Stephen Benson
May 5, 2018
Julio Naranjo
Apr 15, 2018
Neal Manjeshwar
Super strenuous. lots of climbing. 7mi
Feb 17, 2018
Salman Karbasi
12.5mi
Jan 13, 2018
Sabine Schimpf
Dec 25, 2017
Josh Overstreet
First real ride with wewe up Alum Rock 10.5mi
Dec 9, 2017
Peter Silon
Mileage as always in km! 17mi — 1h 30m
Sep 30, 2017
Norbert Barbosa

Trail Ratings

  3.6 from 12 votes

#1934

Overall
  3.6 from 12 votes
5 Star
25%
4 Star
42%
3 Star
8%
2 Star
17%
1 Star
8%
Rankings

#237

in California

#1,934

Overall
188 Views Last Month
6,044 Since Nov 19, 2014
Intermediate Intermediate

0%
18%
55%
27%
0%
0%
Alum Rock Park (since late 2016) is currently open Mondays. Jan 8, 2017
The park is now open 7 days a week. South rim trail and sycamore switchbacks are temporarily closed due to mud slides and tree falls though.. May 19, 2017

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter