MTB Project Logo

St. Patrick's Day Trail

Intermediate
 4.7 (3)

Currently part of the North Country Trail - provides access to Rocky's Run.


Your Rating:      Clear Rating
Your Difficulty:
Your Favorites: Add to Favorites · Your List
Zoom in to see details
Map Key

0.3

Miles

0.4

KM

Singletrack

2,198' 670 m

High

2,093' 638 m

Low

0' 0 m

Up

105' 32 m

Down

7%

Avg Grade (4°)

10%

Max Grade (6°)

Dogs Unknown

E-Bikes Unknown

Description

This section of trail was built early in the year back in the early 2000's when the snow melted earlier than usual. In fact it was built on March 17, hence the name.

It replaced a fall line section of the North Country Trail with a to-spec bench cut and switchback section that added distance and fun.

The end of this trail is opposite the start of Rocky's Run. You can continue on that, or take a right down a short rocky section of an old logging road and head back up North Pale Ale.

Contacts

Shared By:

Jon Sundquist

Trail Ratings

  4.7 from 3 votes

#5932

Overall
  4.7 from 3 votes
5 Star
67%
4 Star
33%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#138

in New York

#5,932

Overall
1 Views Last Month
74 Since Apr 27, 2013
Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

Update Conditions
Unknown See History
Add Your Check-In

Check-Ins

Sep 16, 2018
Kevin Gaczewski