Trail 3

 2 votes
Building Map
Loading Map Data
Map Settings
Featured Ride
Trail

0.5 Miles 0.9 Kilometers


Singletrack

22' 7 m

Ascent

-33' -10 m

Descent

654' 199 m

High

634' 193 m

Low

2%

Avg Grade (1°)

4%

Max Grade (2°)

Unknown

Update

Hard packed singletrack with log jumps, dips, intense climbs, and fast flowing sections.

Adam Aull

Overview

Don't ride when wet. The trail direction is counter-clockwise beginning at the southeast trailhead. Trails are closed during firearms deer and turkey hunting seasons.
Dogs: No Dogs

Description

Trail 3 is a short, easy section which begins at the bailout at the end of Trail 2. It is a wide singletrack through a meadow area. The front half is a steady, slight incline, while the second half is a fast, moderately straight decline.

Contacts

Rate Trail


   Clear

3.5 from 2 votes


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

Sep 3, 2016
Dolan Klein

Trail Ratings

  3.5 from 2 votes

#8492

Overall
  3.5 from 2 votes
1 Star
0%
2 Star
0%
3 Star
50%
4 Star
50%
5 Star
0%
Rankings

#78

in Illinois

#8,492

Overall
1 Views Last Month
33 Since Feb 26, 2014
Easy/Intermediate Easy/Intermediate

50%
0%
50%
0%
0%
0%

Conditions



Forecasting the weather...

0 Comments

MTB Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Mountain Bike

MTB Project is supported by

Support Your Local IMBA Chapter